Rossinavi – Param Jamuna IV (2013)
Naval Architecture: Arrabito Naval Architects
Exterior Styling: Team4Design
This fanstastic project has been launched in 2013 season after 30 months of naval architecture and marine engineering efforts during construction period of about 22 months.
Shipyard was able to perfectly fulfil Arrabito Naval Architects design inputs since the yacht at launching was perfectly balanced as trim and heel, full load displacement value was totally matched according to calculations and stability requirements where completely fulfilled without necessity to add either 1 kg of fixed ballast.
Contractual performances where definitely fulfilled in terms of top speed (23kn) and range obligations.
For more informations, general arrangements, technical specification,
see www.rossinavi.it